{
  "responseHeader":{
    "status":0,
    "QTime":0,
    "params":{
      "q":"iati_identifier:GB-GOV-1-301454-440",
      "fl":"*",
      "format":"json"
    }
  },
  "response":{
    "numFound":1,
    "start":0,
    "numFoundExact":true,
    "docs":[{
      "lang":"en",
      "default_lang":"en",
      "default-currency":"GBP",
      "default_currency":"GBP",
      "hierarchy":2,
      "iati-identifier":"GB-GOV-1-301454-440",
      "iati_identifier":"GB-GOV-1-301454-440",
      "reporting-org.ref":"GB-GOV-1",
      "reporting_org_ref":"GB-GOV-1",
      "reporting-org.type":"10",
      "reporting_org_type_code":"10",
      "reporting-org.narrative":["UK - Foreign, Commonwealth Development Office (FCDO)"],
      "reporting_org_narrative":["UK - Foreign, Commonwealth Development Office (FCDO)"],
      "reporting-org.narrative.lang":[" "],
      "title.narrative":["AZE: Feasibility study for the Integrated water supply infrastructure for the greater Baku area"],
      "title_narrative":["AZE: Feasibility study for the Integrated water supply infrastructure for the greater Baku area"],
      "title_narrative_text":["AZE: Feasibility study for the Integrated water supply infrastructure for the greater Baku area"],
      "title.narrative.lang":[" "],
      "title_narrative_lang":[" "],
      "description.type":["1"],
      "description_type":["1"],
      "description.narrative":["The Project incorporates seven integrated infrastructure works covering key supply lines, drinking water treatment facilities, and ancillary hydraulic structures that supply potable water to Baku city and the Absheron peninsula. The proposed Feasibility Study is a technical assistance assignment that will support the Bank in undertaking detailed assessments required to prepare, structure, and appraise the Project in line with the relevant requirements of the EBRD.\n\nThe Project is expected to finance the rehabilitation of three main water supply pipelines, overhaul and reconstruction of drinking water treatment facilities at source locations and development of reservoirs and supporting hydraulic structures that are essential for delivery of water to the most densely population and economically significant part of Azerbaijan. The Project is also expected to include digital measures including smart water metering and sensors. The final scope and structure of the Project will be confirmed upon full completion and approval of the Feasibility Study."],
      "description_narrative":["The Project incorporates seven integrated infrastructure works covering key supply lines, drinking water treatment facilities, and ancillary hydraulic structures that supply potable water to Baku city and the Absheron peninsula. The proposed Feasibility Study is a technical assistance assignment that will support the Bank in undertaking detailed assessments required to prepare, structure, and appraise the Project in line with the relevant requirements of the EBRD.\n\nThe Project is expected to finance the rehabilitation of three main water supply pipelines, overhaul and reconstruction of drinking water treatment facilities at source locations and development of reservoirs and supporting hydraulic structures that are essential for delivery of water to the most densely population and economically significant part of Azerbaijan. The Project is also expected to include digital measures including smart water metering and sensors. The final scope and structure of the Project will be confirmed upon full completion and approval of the Feasibility Study."],
      "description_narrative_text":["The Project incorporates seven integrated infrastructure works covering key supply lines, drinking water treatment facilities, and ancillary hydraulic structures that supply potable water to Baku city and the Absheron peninsula. The proposed Feasibility Study is a technical assistance assignment that will support the Bank in undertaking detailed assessments required to prepare, structure, and appraise the Project in line with the relevant requirements of the EBRD.\n\nThe Project is expected to finance the rehabilitation of three main water supply pipelines, overhaul and reconstruction of drinking water treatment facilities at source locations and development of reservoirs and supporting hydraulic structures that are essential for delivery of water to the most densely population and economically significant part of Azerbaijan. The Project is also expected to include digital measures including smart water metering and sensors. The final scope and structure of the Project will be confirmed upon full completion and approval of the Feasibility Study."],
      "description.narrative.lang":[" "],
      "description_narrative_lang":[" "],
      "participating-org.ref":["GB-GOV-1","GB-GOV-1","XI-IATI-EBRD"],
      "participating_org_ref":["GB-GOV-1","GB-GOV-1","XI-IATI-EBRD"],
      "participating-org.type":["10","10","40"],
      "participating_org_type":["10","10","40"],
      "participating-org.role":["1","2","4"],
      "participating_org_role":["1","2","4"],
      "participating-org.narrative":["Foreign, Commonwealth and Development Office (FCDO)","Foreign, Commonwealth and Development Office (FCDO)","European Bank for Reconstruction and Development"],
      "participating_org_narrative":["Foreign, Commonwealth and Development Office (FCDO)","Foreign, Commonwealth and Development Office (FCDO)","European Bank for Reconstruction and Development"],
      "participating_org_narrative_text":["Foreign, Commonwealth and Development Office (FCDO)","Foreign, Commonwealth and Development Office (FCDO)","European Bank for Reconstruction and Development"],
      "participating-org.narrative.lang":[" "," "," "],
      "participating_org_narrative_lang":[" "," "," "],
      "activity-status.code":"2",
      "activity_status_code":"2",
      "activity-date.type":["1","2","3"],
      "activity_date_type":["1","2","3"],
      "activity-date.iso-date":["2025-12-17T00:00:00Z","2025-12-02T00:00:00Z","2026-03-31T00:00:00Z"],
      "activity_date_iso_date":["2025-12-17T00:00:00Z","2025-12-02T00:00:00Z","2026-03-31T00:00:00Z"],
      "contact-info.type":["1"],
      "contact_info_type":["1"],
      "contact-info.organisation.narrative":["UK - Foreign, Commonwealth Development Office (FCDO)"],
      "contact_info_organisation_narrative":["UK - Foreign, Commonwealth Development Office (FCDO)"],
      "contact_info_organisation_narrative_text":["UK - Foreign, Commonwealth Development Office (FCDO)"],
      "contact-info.organisation.narrative.lang":[" "],
      "contact_info_organisation_narrative_lang":[" "],
      "contact-info.telephone":["+44 (0) 1355 84 3132"],
      "contact_info_telephone":["+44 (0) 1355 84 3132"],
      "contact-info.email":["enquiry@fcdo.gov.uk"],
      "contact_info_email":["enquiry@fcdo.gov.uk"],
      "contact-info.mailing-address.narrative":["Public Enquiry Point, Abercrombie House, Eaglesham Road, East Kilbride, Glasgow G75 8EA"],
      "contact_info_mailing_address_narrative":["Public Enquiry Point, Abercrombie House, Eaglesham Road, East Kilbride, Glasgow G75 8EA"],
      "contact_info_mailing_address_narrative_text":["Public Enquiry Point, Abercrombie House, Eaglesham Road, East Kilbride, Glasgow G75 8EA"],
      "contact-info.mailing-address.narrative.lang":[" "],
      "contact_info_mailing_address_narrative_lang":[" "],
      "activity-scope.code":"4",
      "activity_scope_code":"4",
      "recipient-country.code":["AZ"],
      "recipient_country_code":["AZ"],
      "recipient-country.percentage":[100.0],
      "recipient_country_percentage":[100.0],
      "location.location-reach.code":["2","2","2"],
      "location_reach_code":["2","2","2"],
      "location.location-id.code":["MD","AM","GE"],
      "location_id_code":["MD","AM","GE"],
      "location.location-id.vocabulary":["A4","A4","A4"],
      "location_id_vocabulary":["A4","A4","A4"],
      "location.name.narrative":["MOLDOVA (REPUBLIC OF)","ARMENIA","GEORGIA"],
      "location_name_narrative":["MOLDOVA (REPUBLIC OF)","ARMENIA","GEORGIA"],
      "location_name_narrative_text":["MOLDOVA (REPUBLIC OF)","ARMENIA","GEORGIA"],
      "location.name.narrative.lang":[" "," "," "],
      "location_name_narrative_lang":[" "," "," "],
      "location.description.narrative":["MOLDOVA (REPUBLIC OF)","ARMENIA","GEORGIA"],
      "location_description_narrative":["MOLDOVA (REPUBLIC OF)","ARMENIA","GEORGIA"],
      "location_description_narrative_text":["MOLDOVA (REPUBLIC OF)","ARMENIA","GEORGIA"],
      "location.description.narrative.lang":[" "," "," "],
      "location_description_narrative_lang":[" "," "," "],
      "location.point.srsName":["http://www.opengis.net/def/crs/EPSG/0/4326","http://www.opengis.net/def/crs/EPSG/0/4326","http://www.opengis.net/def/crs/EPSG/0/4326"],
      "location.point.pos":["47.2022018432617 28.4658718109131","40.2926445007324 44.9394760131836","42.105349 43.673381"],
      "location_point_pos":["47.2022018432617 28.4658718109131","40.2926445007324 44.9394760131836","42.105349 43.673381"],
      "location.exactness.code":["2","2","2"],
      "location_exactness_code":["2","2","2"],
      "location.location-class.code":["1","1","1"],
      "location_class_code":["1","1","1"],
      "location.feature-designation.code":["PCL","PCL","PCL"],
      "location_feature_designation_code":["PCL","PCL","PCL"],
      "sector.vocabulary":["1"],
      "sector_vocabulary":["1"],
      "sector.vocabulary-uri":["http://reference.iatistandard.org/codelists/Sector/"],
      "sector_vocabulary_uri":["http://reference.iatistandard.org/codelists/Sector/"],
      "sector.code":["14015"],
      "sector_code":["14015"],
      "sector.percentage":[100.0],
      "sector_percentage":[100.0],
      "sector.narrative":["Water resources conservation (including data collection)"],
      "sector_narrative":["Water resources conservation (including data collection)"],
      "sector_narrative_text":["Water resources conservation (including data collection)"],
      "sector.narrative.lang":[" "],
      "sector_narrative_lang":[" "],
      "country-budget-items.vocabulary":"1",
      "country_budget_items_vocabulary":"1",
      "country-budget-items.budget-item.code":["14015"],
      "country_budget_items_budget_item_code":["14015"],
      "country-budget-items.budget-item.percentage":[100.0],
      "country_budget_items_budget_item_percentage":[100.0],
      "country-budget-items.budget-item.description.narrative":["Water resources conservation (including data collection)"],
      "country_budget_items_budget_description_narrative":["Water resources conservation (including data collection)"],
      "country_budget_items_budget_description_narrative_text":["Water resources conservation (including data collection)"],
      "country-budget-items.budget-item.description.narrative.lang":[" "],
      "country_budget_items_budget_description_narrative_lang":[" "],
      "default-tied-status.code":"5",
      "default_tied_status_code":"5",
      "budget.type":["1"],
      "budget_type":["1"],
      "budget.period-start.iso-date":["2025-10-01T00:00:00Z"],
      "budget_period_start_iso_date":["2025-10-01T00:00:00Z"],
      "budget.period-end.iso-date":["2025-12-31T00:00:00Z"],
      "budget_period_end_iso_date":["2025-12-31T00:00:00Z"],
      "budget.value":[504000.0],
      "budget_value":[504000.0],
      "budget.value.currency":["GBP"],
      "budget_value_currency":["GBP"],
      "budget.value.value-date":["2025-12-17T00:00:00Z"],
      "budget_value_date":["2025-12-17T00:00:00Z"],
      "transaction.ref":["PUR1171377","300001740842053"],
      "transaction_ref":["PUR1171377","300001740842053"],
      "transaction.transaction-type.code":["2","3"],
      "transaction_type":["2","3"],
      "transaction.transaction-date.iso-date":["2025-12-23T00:00:00Z","2025-12-24T00:00:00Z"],
      "transaction_date_iso_date":["2025-12-23T00:00:00Z","2025-12-24T00:00:00Z"],
      "transaction.value":[504000.0,504000.0],
      "transaction_value":[504000.0,504000.0],
      "transaction.provider-org.ref":["GB-GOV-1","GB-GOV-1"],
      "transaction_provider_org_ref":["GB-GOV-1","GB-GOV-1"],
      "transaction.provider-org.narrative":["Foreign, Commonwealth and Development Office (FCDO)","Foreign, Commonwealth and Development Office (FCDO)"],
      "transaction_provider_org_narrative":["Foreign, Commonwealth and Development Office (FCDO)","Foreign, Commonwealth and Development Office (FCDO)"],
      "transaction_provider_org_narrative_text":["Foreign, Commonwealth and Development Office (FCDO)","Foreign, Commonwealth and Development Office (FCDO)"],
      "transaction.provider-org.narrative.lang":[" "," "],
      "transaction_provider_org_narrative_lang":[" "," "],
      "transaction.receiver-org.ref":["XI-IATI-EBRD","XI-IATI-EBRD"],
      "transaction_receiver_org_ref":["XI-IATI-EBRD","XI-IATI-EBRD"],
      "transaction.receiver-org.narrative":["European Bank for Reconstruction and Development","European Bank for Reconstruction and Development"],
      "transaction_receiver_org_narrative":["European Bank for Reconstruction and Development","European Bank for Reconstruction and Development"],
      "transaction_receiver_org_narrative_text":["European Bank for Reconstruction and Development","European Bank for Reconstruction and Development"],
      "transaction.receiver-org.narrative.lang":[" "," "],
      "transaction_receiver_org_narrative_lang":[" "," "],
      "transaction.value.currency":["GBP","GBP"],
      "transaction_value_currency":["GBP","GBP"],
      "transaction.value.value-date":["2025-12-23T00:00:00Z","2025-12-24T00:00:00Z"],
      "transaction_value_date":["2025-12-23T00:00:00Z","2025-12-24T00:00:00Z"],
      "transaction.description.narrative":["Current Grants"],
      "transaction_description_narrative":["Current Grants"],
      "transaction.description.narrative.lang":[" "],
      "transaction_description_lang":[" "],
      "related-activity.ref":["GB-GOV-1-301454","GB-GOV-1-301454-102","GB-GOV-1-301454-103","GB-GOV-1-301454-104","GB-GOV-1-301454-105","GB-GOV-1-301454-106","GB-GOV-1-301454-107","GB-GOV-1-301454-108","GB-GOV-1-301454-109","GB-GOV-1-301454-110","GB-GOV-1-301454-111","GB-GOV-1-301454-112","GB-GOV-1-301454-113","GB-GOV-1-301454-401","GB-GOV-1-301454-402","GB-GOV-1-301454-403","GB-GOV-1-301454-404","GB-GOV-1-301454-405","GB-GOV-1-301454-406","GB-GOV-1-301454-407","GB-GOV-1-301454-408","GB-GOV-1-301454-409","GB-GOV-1-301454-410","GB-GOV-1-301454-413","GB-GOV-1-301454-414","GB-GOV-1-301454-415","GB-GOV-1-301454-417","GB-GOV-1-301454-418","GB-GOV-1-301454-419","GB-GOV-1-301454-420","GB-GOV-1-301454-421","GB-GOV-1-301454-422","GB-GOV-1-301454-424","GB-GOV-1-301454-425","GB-GOV-1-301454-426","GB-GOV-1-301454-427","GB-GOV-1-301454-428","GB-GOV-1-301454-429","GB-GOV-1-301454-430","GB-GOV-1-301454-431","GB-GOV-1-301454-432","GB-GOV-1-301454-433","GB-GOV-1-301454-434","GB-GOV-1-301454-435","GB-GOV-1-301454-436","GB-GOV-1-301454-437","GB-GOV-1-301454-438","GB-GOV-1-301454-439","GB-GOV-1-301454-441","GB-GOV-1-301454-442"],
      "related_activity_ref":["GB-GOV-1-301454","GB-GOV-1-301454-102","GB-GOV-1-301454-103","GB-GOV-1-301454-104","GB-GOV-1-301454-105","GB-GOV-1-301454-106","GB-GOV-1-301454-107","GB-GOV-1-301454-108","GB-GOV-1-301454-109","GB-GOV-1-301454-110","GB-GOV-1-301454-111","GB-GOV-1-301454-112","GB-GOV-1-301454-113","GB-GOV-1-301454-401","GB-GOV-1-301454-402","GB-GOV-1-301454-403","GB-GOV-1-301454-404","GB-GOV-1-301454-405","GB-GOV-1-301454-406","GB-GOV-1-301454-407","GB-GOV-1-301454-408","GB-GOV-1-301454-409","GB-GOV-1-301454-410","GB-GOV-1-301454-413","GB-GOV-1-301454-414","GB-GOV-1-301454-415","GB-GOV-1-301454-417","GB-GOV-1-301454-418","GB-GOV-1-301454-419","GB-GOV-1-301454-420","GB-GOV-1-301454-421","GB-GOV-1-301454-422","GB-GOV-1-301454-424","GB-GOV-1-301454-425","GB-GOV-1-301454-426","GB-GOV-1-301454-427","GB-GOV-1-301454-428","GB-GOV-1-301454-429","GB-GOV-1-301454-430","GB-GOV-1-301454-431","GB-GOV-1-301454-432","GB-GOV-1-301454-433","GB-GOV-1-301454-434","GB-GOV-1-301454-435","GB-GOV-1-301454-436","GB-GOV-1-301454-437","GB-GOV-1-301454-438","GB-GOV-1-301454-439","GB-GOV-1-301454-441","GB-GOV-1-301454-442"],
      "related-activity.type":["1","3","3","3","3","3","3","3","3","3","3","3","3","3","3","3","3","3","3","3","3","3","3","3","3","3","3","3","3","3","3","3","3","3","3","3","3","3","3","3","3","3","3","3","3","3","3","3","3","3"],
      "related_activity_type":["1","3","3","3","3","3","3","3","3","3","3","3","3","3","3","3","3","3","3","3","3","3","3","3","3","3","3","3","3","3","3","3","3","3","3","3","3","3","3","3","3","3","3","3","3","3","3","3","3","3"],
      "reporting-org.type.name":"Government",
      "reporting_org_type_name":"Government",
      "recipient-country.name":["Azerbaijan"],
      "recipient_country_name":["Azerbaijan"],
      "budget.type.name":["Original"],
      "title.narrative.first":"AZE: Feasibility study for the Integrated water supply infrastructure for the greater Baku area",
      "title_narrative_first":"AZE: Feasibility study for the Integrated water supply infrastructure for the greater Baku area",
      "activity-date.start-planned":"2025-12-17T00:00:00Z",
      "activity_date_start_planned":"Wed Dec 17 00:00:00 UTC 2025",
      "activity_date_start_planned_f":"2025-12-17T00:00:00Z",
      "activity-date.common.start":"2025-12-02T00:00:00Z",
      "activity_date_start_common":"Tue Dec 02 00:00:00 UTC 2025",
      "activity_date_start_common_f":"2025-12-02T00:00:00Z",
      "activity-date.start-actual":"2025-12-02T00:00:00Z",
      "activity_date_start_actual":"Tue Dec 02 00:00:00 UTC 2025",
      "activity_date_start_actual_f":"2025-12-02T00:00:00Z",
      "activity-date.end-planned":"2026-03-31T00:00:00Z",
      "activity_date_end_planned":"Tue Mar 31 00:00:00 UTC 2026",
      "activity_date_end_planned_f":"2026-03-31T00:00:00Z",
      "activity-date.common.end":"2026-03-31T00:00:00Z",
      "activity_date_end_common":"Tue Mar 31 00:00:00 UTC 2026",
      "activity_date_end_common_f":"2026-03-31T00:00:00Z",
      "activity-status.text":"Implementation",
      "activity_status_text":"Implementation",
      "budget.value-usd":[666943.2700912467],
      "budget_value_usd":[666943.2700912467],
      "budget.value-usd.sum":666943.2700912467,
      "budget_value_usd_sum":666943.2700912467,
      "budget.value-usd.conversion-rate":[0.7556864618051339],
      "budget_usd_conversion_rate":[0.7556864618051339],
      "budget.value-usd.conversion-currency":["GBP"],
      "budget.value-gbp":[504000.0],
      "budget_value_gbp":[504000.0],
      "budget.value-gbp.sum":504000.0,
      "budget_value_gbp_sum":504000.0,
      "budget.value-gbp.conversion-rate":[1.0],
      "budget_gbp_conversion_rate":[1.0],
      "budget.value-gbp.conversion-currency":["GBP"],
      "transaction.value-usd.sum":1333886.5401824934,
      "transaction_value_usd_sum":1333886.5401824934,
      "transaction.value-usd.conversion-rate":[0.7556864618051339,0.7556864618051339],
      "transaction_usd_conversion_rate":[0.7556864618051339,0.7556864618051339],
      "transaction.value-usd.conversion-currency":["GBP"],
      "transaction.value-gbp.sum":1008000.0,
      "transaction_value_gbp_sum":1008000.0,
      "transaction.value-gbp.conversion-rate":[1.0,1.0],
      "transaction_gbp_conversion_rate":[1.0,1.0],
      "transaction.value-gbp.conversion-currency":["GBP"],
      "dataset.id":"4841c06f-0067-4269-b9c0-ebc08dff2e8e",
      "dataset_iati_id":"4841c06f-0067-4269-b9c0-ebc08dff2e8e",
      "dataset.name":"fcdo-set-19",
      "dataset_name":"fcdo-set-19",
      "dataset.extras.iati_version":"2.03",
      "dataset.resources.hash":"371e0185d1988404ea67e85d6e3e402f7f1c7179",
      "dataset.resources.url":"http://iati.fcdo.gov.uk/iati_files/solr/FCDO-set-19.xml",
      "activity-date.quarter":[4,4,1],
      "budget.period-start.quarter":[4],
      "budget.period-end.quarter":[4],
      "transaction.transaction-date.quarter":[4,4],
      "transaction.value-usd":[666943.2700912467,666943.2700912467],
      "transaction_value_usd":[666943.2700912467,666943.2700912467],
      "transaction.value-usd-type":[2,3],
      "transaction.value-gbp":[504000.0,504000.0],
      "transaction_value_gbp":[504000.0,504000.0],
      "transaction.value-gbp-type":[2,3],
      "activity-aggregation.budget.value":504000.0,
      "activity_aggregation_budget_value":504000.0,
      "activity-aggregation.budget.value-usd":666943.2700912467,
      "activity_aggregation_budget_value_usd":666943.2700912467,
      "activity-aggregation.budget.value-gbp":504000.0,
      "activity_aggregation_budget_value_gbp":504000.0,
      "activity-aggregation.budget.currency":"GBP",
      "activity_aggregation_budget_currency":"GBP",
      "activity-aggregation.outgoing-commitment.value":504000.0,
      "activity_aggregation_commitment_value":504000.0,
      "activity-aggregation.outgoing-commitment.value-usd":666943.2700912467,
      "activity_aggregation_commitment_value_usd":666943.2700912467,
      "activity-aggregation.outgoing-commitment.value-gbp":504000.0,
      "activity_aggregation_commitment_value_gbp":504000.0,
      "activity-aggregation.disbursement.value":504000.0,
      "activity_aggregation_disbursement_value":504000.0,
      "activity-aggregation.disbursement.value-usd":666943.2700912467,
      "activity_aggregation_disbursement_value_usd":666943.2700912467,
      "activity-aggregation.disbursement.value-gbp":504000.0,
      "activity_aggregation_disbursement_value_gbp":504000.0,
      "json.reporting-org":"{\"ref\": \"GB-GOV-1\", \"type\": 10, \"narrative\": \"UK - Foreign, Commonwealth Development Office (FCDO)\", \"narrative.lang\": \" \"}",
      "json.title":"{\"narrative\": \"AZE: Feasibility study for the Integrated water supply infrastructure for the greater Baku area\", \"narrative.lang\": \" \"}",
      "json.description":["{\"type\": 1, \"narrative\": \"The Project incorporates seven integrated infrastructure works covering key supply lines, drinking water treatment facilities, and ancillary hydraulic structures that supply potable water to Baku city and the Absheron peninsula. The proposed Feasibility Study is a technical assistance assignment that will support the Bank in undertaking detailed assessments required to prepare, structure, and appraise the Project in line with the relevant requirements of the EBRD.\\n\\nThe Project is expected to finance the rehabilitation of three main water supply pipelines, overhaul and reconstruction of drinking water treatment facilities at source locations and development of reservoirs and supporting hydraulic structures that are essential for delivery of water to the most densely population and economically significant part of Azerbaijan. The Project is also expected to include digital measures including smart water metering and sensors. The final scope and structure of the Project will be confirmed upon full completion and approval of the Feasibility Study.\", \"narrative.lang\": \" \"}"],
      "json.participating-org":["{\"ref\": \"GB-GOV-1\", \"type\": 10, \"role\": 1, \"narrative\": \"Foreign, Commonwealth and Development Office (FCDO)\", \"narrative.lang\": \" \"}","{\"ref\": \"GB-GOV-1\", \"type\": 10, \"role\": 2, \"narrative\": \"Foreign, Commonwealth and Development Office (FCDO)\", \"narrative.lang\": \" \"}","{\"ref\": \"XI-IATI-EBRD\", \"type\": 40, \"role\": 4, \"narrative\": \"European Bank for Reconstruction and Development\", \"narrative.lang\": \" \"}"],
      "json.activity-date":["{\"type\": 1, \"iso-date\": \"2025-12-17\"}","{\"type\": 2, \"iso-date\": \"2025-12-02\"}","{\"type\": 3, \"iso-date\": \"2026-03-31\"}"],
      "json.contact-info":["{\"type\": 1, \"organisation\": {\"narrative\": \"UK - Foreign, Commonwealth Development Office (FCDO)\", \"narrative.lang\": \" \"}, \"telephone\": \"+44 (0) 1355 84 3132\", \"email\": \"enquiry@fcdo.gov.uk\", \"mailing-address\": {\"narrative\": \"Public Enquiry Point, Abercrombie House, Eaglesham Road, East Kilbride, Glasgow G75 8EA\", \"narrative.lang\": \" \"}}"],
      "json.recipient-country":["{\"code\": \"AZ\", \"percentage\": 100.0}"],
      "json.location":["{\"location-reach\": {\"code\": 2}, \"location-id\": {\"code\": \"MD\", \"vocabulary\": \"A4\"}, \"name\": {\"narrative\": \"MOLDOVA (REPUBLIC OF)\", \"narrative.lang\": \" \"}, \"description\": {\"narrative\": \"MOLDOVA (REPUBLIC OF)\", \"narrative.lang\": \" \"}, \"point\": {\"srsName\": \"http://www.opengis.net/def/crs/EPSG/0/4326\", \"pos\": \"47.2022018432617 28.4658718109131\"}, \"exactness\": {\"code\": 2}, \"location-class\": {\"code\": 1}, \"feature-designation\": {\"code\": \"PCL\"}}","{\"location-reach\": {\"code\": 2}, \"location-id\": {\"code\": \"AM\", \"vocabulary\": \"A4\"}, \"name\": {\"narrative\": \"ARMENIA\", \"narrative.lang\": \" \"}, \"description\": {\"narrative\": \"ARMENIA\", \"narrative.lang\": \" \"}, \"point\": {\"srsName\": \"http://www.opengis.net/def/crs/EPSG/0/4326\", \"pos\": \"40.2926445007324 44.9394760131836\"}, \"exactness\": {\"code\": 2}, \"location-class\": {\"code\": 1}, \"feature-designation\": {\"code\": \"PCL\"}}","{\"location-reach\": {\"code\": 2}, \"location-id\": {\"code\": \"GE\", \"vocabulary\": \"A4\"}, \"name\": {\"narrative\": \"GEORGIA\", \"narrative.lang\": \" \"}, \"description\": {\"narrative\": \"GEORGIA\", \"narrative.lang\": \" \"}, \"point\": {\"srsName\": \"http://www.opengis.net/def/crs/EPSG/0/4326\", \"pos\": \"42.105349 43.673381\"}, \"exactness\": {\"code\": 2}, \"location-class\": {\"code\": 1}, \"feature-designation\": {\"code\": \"PCL\"}}"],
      "json.sector":["{\"vocabulary\": 1, \"vocabulary-uri\": \"http://reference.iatistandard.org/codelists/Sector/\", \"code\": 14015, \"percentage\": 100.0, \"narrative\": \"Water resources conservation (including data collection)\", \"narrative.lang\": \" \"}"],
      "json.country-budget-items":"{\"vocabulary\": 1, \"budget-item\": {\"code\": 14015, \"percentage\": 100, \"description\": {\"narrative\": \"Water resources conservation (including data collection)\", \"narrative.lang\": \" \"}}}",
      "json.budget":["{\"type\": 1, \"period-start\": [{\"iso-date\": \"2025-10-01\"}], \"period-end\": [{\"iso-date\": \"2025-12-31\"}], \"value\": 504000, \"value.currency\": \"GBP\", \"value.value-date\": \"2025-12-17\"}"],
      "json.transaction":["{\"ref\": \"PUR1171377\", \"transaction-type\": {\"code\": 2}, \"transaction-date\": {\"iso-date\": \"2025-12-23\"}, \"value\": 504000.0, \"provider-org\": {\"ref\": \"GB-GOV-1\", \"narrative\": \"Foreign, Commonwealth and Development Office (FCDO)\", \"narrative.lang\": \" \"}, \"receiver-org\": {\"ref\": \"XI-IATI-EBRD\", \"narrative\": \"European Bank for Reconstruction and Development\", \"narrative.lang\": \" \"}, \"value.currency\": \"GBP\", \"value.value-date\": \"2025-12-23\"}","{\"ref\": 300001740842053, \"transaction-type\": {\"code\": 3}, \"transaction-date\": {\"iso-date\": \"2025-12-24\"}, \"value\": 504000.0, \"description\": {\"narrative\": \"Current Grants\", \"narrative.lang\": \" \"}, \"provider-org\": {\"ref\": \"GB-GOV-1\", \"narrative\": \"Foreign, Commonwealth and Development Office (FCDO)\", \"narrative.lang\": \" \"}, \"receiver-org\": {\"ref\": \"XI-IATI-EBRD\", \"narrative\": \"European Bank for Reconstruction and Development\", \"narrative.lang\": \" \"}, \"value.currency\": \"GBP\", \"value.value-date\": \"2025-12-24\"}"],
      "json.related-activity":["{\"ref\": \"GB-GOV-1-301454\", \"type\": 1}","{\"ref\": \"GB-GOV-1-301454-102\", \"type\": 3}","{\"ref\": \"GB-GOV-1-301454-103\", \"type\": 3}","{\"ref\": \"GB-GOV-1-301454-104\", \"type\": 3}","{\"ref\": \"GB-GOV-1-301454-105\", \"type\": 3}","{\"ref\": \"GB-GOV-1-301454-106\", \"type\": 3}","{\"ref\": \"GB-GOV-1-301454-107\", \"type\": 3}","{\"ref\": \"GB-GOV-1-301454-108\", \"type\": 3}","{\"ref\": \"GB-GOV-1-301454-109\", \"type\": 3}","{\"ref\": \"GB-GOV-1-301454-110\", \"type\": 3}","{\"ref\": \"GB-GOV-1-301454-111\", \"type\": 3}","{\"ref\": \"GB-GOV-1-301454-112\", \"type\": 3}","{\"ref\": \"GB-GOV-1-301454-113\", \"type\": 3}","{\"ref\": \"GB-GOV-1-301454-401\", \"type\": 3}","{\"ref\": \"GB-GOV-1-301454-402\", \"type\": 3}","{\"ref\": \"GB-GOV-1-301454-403\", \"type\": 3}","{\"ref\": \"GB-GOV-1-301454-404\", \"type\": 3}","{\"ref\": \"GB-GOV-1-301454-405\", \"type\": 3}","{\"ref\": \"GB-GOV-1-301454-406\", \"type\": 3}","{\"ref\": \"GB-GOV-1-301454-407\", \"type\": 3}","{\"ref\": \"GB-GOV-1-301454-408\", \"type\": 3}","{\"ref\": \"GB-GOV-1-301454-409\", \"type\": 3}","{\"ref\": \"GB-GOV-1-301454-410\", \"type\": 3}","{\"ref\": \"GB-GOV-1-301454-413\", \"type\": 3}","{\"ref\": \"GB-GOV-1-301454-414\", \"type\": 3}","{\"ref\": \"GB-GOV-1-301454-415\", \"type\": 3}","{\"ref\": \"GB-GOV-1-301454-417\", \"type\": 3}","{\"ref\": \"GB-GOV-1-301454-418\", \"type\": 3}","{\"ref\": \"GB-GOV-1-301454-419\", \"type\": 3}","{\"ref\": \"GB-GOV-1-301454-420\", \"type\": 3}","{\"ref\": \"GB-GOV-1-301454-421\", \"type\": 3}","{\"ref\": \"GB-GOV-1-301454-422\", \"type\": 3}","{\"ref\": \"GB-GOV-1-301454-424\", \"type\": 3}","{\"ref\": \"GB-GOV-1-301454-425\", \"type\": 3}","{\"ref\": \"GB-GOV-1-301454-426\", \"type\": 3}","{\"ref\": \"GB-GOV-1-301454-427\", \"type\": 3}","{\"ref\": \"GB-GOV-1-301454-428\", \"type\": 3}","{\"ref\": \"GB-GOV-1-301454-429\", \"type\": 3}","{\"ref\": \"GB-GOV-1-301454-430\", \"type\": 3}","{\"ref\": \"GB-GOV-1-301454-431\", \"type\": 3}","{\"ref\": \"GB-GOV-1-301454-432\", \"type\": 3}","{\"ref\": \"GB-GOV-1-301454-433\", \"type\": 3}","{\"ref\": \"GB-GOV-1-301454-434\", \"type\": 3}","{\"ref\": \"GB-GOV-1-301454-435\", \"type\": 3}","{\"ref\": \"GB-GOV-1-301454-436\", \"type\": 3}","{\"ref\": \"GB-GOV-1-301454-437\", \"type\": 3}","{\"ref\": \"GB-GOV-1-301454-438\", \"type\": 3}","{\"ref\": \"GB-GOV-1-301454-439\", \"type\": 3}","{\"ref\": \"GB-GOV-1-301454-441\", \"type\": 3}","{\"ref\": \"GB-GOV-1-301454-442\", \"type\": 3}"],
      "id":"f95745ad-a2dc-4a26-93f1-f8c416d39503",
      "_version_":1880613798465765378
    }]
  }
}